All projects
UKL-UPL
Preparation of the UKL-UPL Document for the Construction of a Retaining Wall at the Pangkung Keputungan River Mouth, Pangkung Tibah Village, Kediri District, Tabanan Regency
Preparation of the UKL-UPL environmental management and monitoring document for the construction of a retaining wall at the Pangkung Keputungan River Mouth, Tabanan Regency.
Client
PT Dwipa Tunasbumi Candra
Year
2024
Type of Work
UKL-UPL
The project
Built around what matters.
Preparation of the UKL-UPL environmental management and monitoring document for the construction of a retaining wall at the Pangkung Keputungan River Mouth, Tabanan Regency.
More from Scatama
Related projects
Technical Details (RINTEK)
Preparation of the Technical Details Document for Temporary Storage of B3 Hazardous Waste at Banyuasri Market
Explore project ↗Technical Details (RINTEK)
Preparation of the Technical Details Document for Temporary Storage of B3 Hazardous Waste at Prodia Denpasar Clinical Laboratory
Explore project ↗Technical Details (RINTEK)