All projects
UKL-UPL
Preparation of the Environmental Document for the Development of a Porang Tuber Processing Plant in Tabanan Regency
Preparation of the UKL-UPL environmental management and monitoring document for the development of a porang tuber processing plant in Tabanan Regency.
Client
Tabanan Regency Industry and Trade Office
Year
2021
Type of Work
UKL-UPL
The project
Built around what matters.
Preparation of the UKL-UPL environmental management and monitoring document for the development of a porang tuber processing plant in Tabanan Regency.
More from Scatama
Related projects
Technical Details (RINTEK)
Preparation of the Technical Details Document for Temporary Storage of B3 Hazardous Waste at Banyuasri Market
Explore project ↗Technical Details (RINTEK)
Preparation of the Technical Details Document for Temporary Storage of B3 Hazardous Waste at Prodia Denpasar Clinical Laboratory
Explore project ↗Technical Details (RINTEK)