AMDAL work for the Sarbagita Raw Water Supply System (Sidan Dam).
Client
Balai Wilayah Sungai Bali-Penida, Directorate General of Water Resources, Ministry of Public Works
Year
2020
Type of Work
AMDAL
The project
Built around what matters.
AMDAL work for the Sarbagita Raw Water Supply System (Sidan Dam).
More from Scatama
Related projects
Technical Details (RINTEK)
Preparation of the Technical Details Document for Temporary Storage of B3 Hazardous Waste at Banyuasri Market
Explore project ↗Technical Details (RINTEK)
Preparation of the Technical Details Document for Temporary Storage of B3 Hazardous Waste at Prodia Denpasar Clinical Laboratory
Explore project ↗Technical Details (RINTEK)